Not long to go until land registration

We received the preliminary plans for our home on 30 October 2015 and was also informed that our land was close to registration.

Upon hearing this news, we headed towards the blocks of land in which our lot was situated.

Here's a snapshot:



It's an awesome feeling to have seen our block of land. As it's on a slight slope, we'd probably want to place a high fence on top of the retaining wall for privacy reasons.

It seems the pathways are being done at this point in time. Hopefully not long to go until the land is registered. Fingers crossed it's by the end of 2015!




Friday 30 October 2015

So far...

From the initial $1000 holding deposit until present, we have been busy completing all the administrative steps before actual construction. Below is the document we received from Firstyle Homes outline the steps needed to be taken before we could starting building.


Credit: Firstyle Home as current as of 1/7/15

After nominating a solicitor we soon received our Land Contract (14/7/15). Since our land registration is not due until December there was no real rush. We took our time going through the contract ourselves and with our solicitor to determine if there were any points in the contract that would negatively impact us.  

We were sent a Fixed Price Tender (29/7/15) which outlined all their basic inclusions. We had to sign off on the Fixed Price Tender first and also make a $15, 4000 non-refundable 'planning and administration' fee before we could move onto the next step. 

Once the Fixed Price Tender was signed we received a Firstyle Colour Selections Pack which included all the selections we had ranging from exteriors (e.g. bricks, roofing, garage etc.) as well as internal selections (e.g. taps, doors, kitchen, bathroom etc.). We were informed our Colour Selections appointment will take place later on once our land is registered and closer to construction. 

Following the Fixed Price Tender we had option to include any variations or upgrades to the design. 

A few of the variations we included:
  • Higher ceilings (from standard 2.4m to 2.7m)
  • Floor-to-ceiling tiling in bathroom/s (initially 1.8m)
  • Sliding translucent wardrobes in lieu of swinging doors
  • Gas point to alfresco (for BBQ and/or patio heater)
  • Roof sarking
So now  we are just playing the waiting game.. 


Monday 1 June 2015

The Beginning...

Earlier this year we came to the decision that we needed to grow up and start building our future together. By 'building a future together' we didn't realise we were going to embark on an adventure to build our very first home! So the search began.

We started off exploring our options on various real estate search engines like www.domain.com.au and www.realestate.com.au. It took us a while to narrow down what type of house we were looking for. After a few months of searching online and house inspections we decided that we actually wanted to build our first home.

In July 2015, we found a House&Land package in Edmondson Park from Firstyle Homes.

We're proud to say we're building the HARRINGTON 18.4 MKII by Firstyle Homes. It's a small and cosy home that suits our needs and we are extremely excited to see it come to fruition.

So we thought we would document and share our journey from start to finish. Please feel free to leave any questions, comments or advice :)


Firstyle Homes Edmondson Park

  • Display Centre: 9 Clement Road, Edmondson Park NSW 2174 
  • Contact: 9608 9777 or 0418277918 
  • Website: www.firstyle.com.au